Interface: Inland Empire 511 and SCRRA Train Control and Operations Center

Inland Empire 511 and SCRRA Train Control and Operations Center

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Inland Empire 511   SCRRA Train Control and Operations Center
SCRRA Train Control and Operations Center transit schedule adherence information (P)

transit and fare schedules (P)

Inland Empire 511