Interface: Inland Empire 511 and SCRRA Train Control and Operations Center
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Inland Empire 511
SCRRA Train Control and Operations Center
SCRRA Train Control and Operations Center
transit schedule adherence information (P)
transit and fare schedules (P)
Inland Empire 511