Interface: SCRRA On-board PTC Component and SCRRA Wayside Signal System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
SCRRA On-board PTC Component
rail location data_ud (P)
SCRRA Wayside Signal System
SCRRA Wayside Signal System
SCRRA On-board PTC Component