Interface: Arterial Traffic Control Systems and SCRRA Rail Information System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Arterial Traffic Control Systems
transportation system status (P)
threat information (P)
SCRRA Rail Information System
SCRRA Rail Information System
Arterial Traffic Control Systems