Interface: Commercial Vehicles and Port Roadside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Commercial Vehicles
commercial vehicle disable status (E)
expected driver identity characteristics (E)
hazmat environmental factors (E)
freight breach (E)
freight equipment information (E)
commercial vehicle breach (E)
driver log (E)
tag data (E)
safety inspection record (E)
on-board safety data (E)
electronic lock data (E)
screening event record (E)
Port Roadside Equipment
Port Roadside Equipment
safety inspection request (E)
driver log request (E)
safety inspection record (E)
request tag data (E)
pass/pull-in (E)
on-board safety request (E)
electronic lock data request (E)
electronic screening request (E)
screening event record (E)
Commercial Vehicles