Interface: Port Operation Centers and Port Roadside Equipment

Port Operation Centers and Port Roadside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Port Operation Centers cv driver record (E)

safety status information (E)

accident report (E)

credentials status information (E)

credentials information (E)

citation (E)

safety inspection report (E)

video surveillance control (E)

traffic sensor control (E)

roadway information system data (E)

secure area surveillance control (E)

secure area sensor control (E)

infrastructure monitoring sensor control (E)

Port Roadside Equipment
Port Roadside Equipment cv driver record request (E)

alarm (E)

accident report (E)

violation notification (E)

daily site activity data (E)

citation (E)

safety inspection report (E)

traffic images (E)

traffic flow (E)

roadway information system status (E)

secure area sensor data (E)

infrastructure monitoring sensor data (E)

secure area surveillance data (E)

Port Operation Centers