Interface: Arterial Roadside Equipment and Railroad Roadside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Arterial Roadside Equipment
intersection blockage notification (E)
hri operational status (E)
Railroad Roadside Equipment
Railroad Roadside Equipment
track status (E)
arriving train information (E)
Arterial Roadside Equipment