Interface: Arterial Roadside Equipment and Railroad Roadside Equipment

Arterial Roadside Equipment and Railroad Roadside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Arterial Roadside Equipment intersection blockage notification (E)

hri operational status (E)

Railroad Roadside Equipment
Railroad Roadside Equipment track status (E)

arriving train information (E)

Arterial Roadside Equipment