Interface: 511 MATIS/Go511 and SCRRA Rail Information System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
511 MATIS/Go511
SCRRA Rail Information System
SCRRA Rail Information System
transit schedule adherence information (E)
transit incident information (E)
transit and fare schedules (E)
511 MATIS/Go511