Interface: 511 MATIS/Go511 and SCRRA Rail Information System

511 MATIS/Go511 and SCRRA Rail Information System

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
511 MATIS/Go511   SCRRA Rail Information System
SCRRA Rail Information System transit schedule adherence information (E)

transit incident information (E)

transit and fare schedules (E)

511 MATIS/Go511