Interface: 511 MATIS/Go511 and SCRRA Train Control and Operations Center
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
511 MATIS/Go511
SCRRA Train Control and Operations Center
SCRRA Train Control and Operations Center
transit schedule adherence information (P)
transit and fare schedules (P)
511 MATIS/Go511