Interface: CHP Dispatch and SCAG ERTMIS
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
CHP Dispatch
emergency archive data (P)
SCAG ERTMIS
SCAG ERTMIS
CHP Dispatch