Interface: Caltrans Regional TMCs and RIITS
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Caltrans Regional TMCs
evacuation information (P)
incident information (E)
road network conditions (E)
RIITS
RIITS
transportation information for operations (E)
Caltrans Regional TMCs