Interface: Caltrans Regional TMCs and 511 MATIS/Go511
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Caltrans Regional TMCs
incident information (E)
road network conditions (E)
511 MATIS/Go511
511 MATIS/Go511
Caltrans Regional TMCs