Interface: Caltrans Regional TMCs and CHP Dispatch
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Caltrans Regional TMCs
road network conditions (P)
CHP Dispatch
CHP Dispatch
Caltrans Regional TMCs